№  Subject Accomplish- ment year Customer, facility location Summary
1 “Overflow fuel gas recovery system installation on heat electric generation plant of JSC ”Kuibyshev Refinery“ design documentation development. 2011-
2012
JSC ”Kuibyshev Refinery“, Samara Design and operational documentation development for 4 boiler units and heating unit automated control system of present heat electric generation plant.
2 Design and exploration works at ”Pressure reduction spool and metering station repair“. 2011 LLC ”VolgoUralNIPIgas“, Orenburg Design and operational documentation development for gas metering station. Safety expert review. Metrological testing.
3 ”Automatics and telemechanics system upgrade of reduction pump station № 4“ design documentation development. 2011 JSC ”Volzhskaya territorial generating company“, Samara Operational documentation development. Top level supervisory control system on mobile communication channel development. Software configuration.
4 Design documentation development of 25 gas volume automated measuring systems at OJSC ”Samaraneftegas“ production fields. 2011 LLC ”Samara scientific research and design institute“, Samara 25 gas volume automated measuring systems with ”Dymetic“ type ultrasonic gas meters design and operational documentation development. Safety expert review. Metrological testing.
5 Design documentation development of 17 gas volume automated measuring systems at CJSC ”SANEKO“ production fields. 2011 Oil producing company CJSC"SANEKO”, Samara 17 gas volume automated measuring systems with cyclonic gas meters design and operational documentation development. Safety expert review. Metrological testing. Procedure of measurements development, approval and certification.
6 Design documentation development of gas volume automated measuring system technical upgrading. 2011 CJSC “Terminal ”PION“, Orenburg region, Sorochinsk 2 gas volume automated measuring systems with cyclonic gas meters design and operational documentation development. Safety expert review. Metrological testing. Procedure of measurements development, approval and certification.
7 66 flare units gas volume automated measuring systems of JSC ”Orenburgneft“ facilities design and exploration works. 2011 TNK-BP, JSC ”Orenburgneft“, Buzuluk 66 flare gas volume automated measuring systems with cyclonic and ultrasonic gas meters design and operational documentation development. Safety expert review. Metrological testing. Procedure of measurements development, approval and certification.
8 Main pipeline ”Buguruslan-Syzran“ quality measurement unit fitting downstream of pump station ”Krotovka“ design and exploration works; technical upgrading. 2010 ”Transneft“, JSC ”Giprotruboprovod“, Moscow 2 quality assurance units in block-boxes design and operational documentation development. Safety expert review. Metrological testing.
9 Main pipeline ”Bavly-Kuybyshev“ quality measurement unit fitting downstream of pump station ”Krotovka“ design and exploration works; technical upgrading. 2010 ”Transneft“, JSC ”Giprotruboprovod“, Moscow 2 quality assurance units in block-boxes design and operational documentation development. Safety expert review. Metrological testing.
10 Chromium trioxide metering system in workshop № 9 design documentation development. 2010 CJSC ”Novokuybyshevsk petrochemical company“, Samara region, Novokuybyshevsk Chromium trioxide metering system on mass flowmeter basis design and operational documentation development.
11 Gas and Water Transfer Metering Systems design documentation development. 2010 LLC ”Tyumen Pribor“, Tyumen 4 modular units gas and water metering systems design and operational documentation development.
12 Design documentation development of 31 gas volume automated measuring systems at OJSC ”Samaraneftegas“ production fields. 2010 LLC ”Samara scientific research and design institute“, Samara 31 gas volume automated measuring systems with optical gas meters design and operational documentation development. Safety expert review. Metrological testing.
13 Crude oil, 4 gas volume automated measuring system at ”Chaganskaya“ facility of OJSC ”Samaraneftegas“ design documentation development. 2010 LLC ”Samara scientific research and design institute“, Samara Oil metering system and gas measuring system in block-boxes design and operational documentation development. Safety expert review. Metrological testing.
14 Crude oil, 4 gas volume automated measuring system at ”Zapadno-Kommunarskoye“ facility of OJSC ”Samaraneftegas“ design documentation development. 2009 LLC ”Samara scientific research and design institute“, Samara Oil metering system and gas measuring system in block-boxes design and operational documentation development. Safety expert review. Metrological testing.
15 Design documentation development of 38 flare gas volume automated measuring systems at OJSC ”Samaraneftegas“ production fields. 2009 LLC ”Samara scientific research and design institute“, Samara 38 gas volume automated measuring systems with optical gas meters design and operational documentation development. Safety expert review. Metrological testing.
16 Design documentation development of 3 flare gas volume automated measuring systems. 2009 JSC ”Giprovostokneft“, Samara 3 gas volume automated measuring systems with optical gas meters design and operational documentation development. Safety expert review. Metrological testing.

In 2011 the total scope of Design and Engineering Works was 29 million rubles.

Construction and Assembly Operations

№  Subject Accomplish- ment year Customer, facility location Summary
1 Construction and assembly operations: Overflow fuel gas system utilization on heat electric generation plant of JSC ”Kuibyshev Refinery“ installation. 2011-
2012
JSC ”Kuibyshev Refinery“, Samara 4 boiler units with a capacity of 60 megawatt each full automation. 3 fuel types.
2 Instrumentation and control on concentrate propylene unit setup and assembly. 2011 JSC ”SANORS“, Samara region, Novokuybyshevsk 60 units instrumentation and control; 40 valves; 13 km cable laying.
3 Block-modular associated petroleum gas volume measuring systems production (OJSC ”Samaraneftegas“ facility). 2011 LLC ”OZNA-Engineering“, Ufa 40 gas volume measuring systems production, nominal diameter 50–300 mm. The whole metal structure mass is 140 tons.
4 Oil treatment unit with capacity 1200 tons per twenty-four hours full automation. 2011 Oil producing company CJSC"SANEKO”, Samara Construction and assembly operations, cable connection laying. Start-up operations. Cоmmissioning. Personnel training.
6 Vibration-based diagnostics system of delayed coker unit assembling and setup. 2010 CJSC “PromServis”, Ulyanovsk region, Dimitrovgrad Vibration-based diagnostics system on 4 pump stations construction and assembly operations and start-up operations.
7 LabAUIK-400 unit automatic control system production and supply. 2010 LLC “Ayaks enterprise”, Samara Unit automation for cable production verification in high temperature and pressure.
8 Associated gas volume automated measuring systems at OJSC “Samaraneftegas” production fields constructing and assembling. 2010 JSC “Samaraneftegas”, Samara Turn-key 36 associated gas volume automated measuring systems construction, nominal diameter 50–250 mm.
9 10 associated gas volume automated measuring systems at JSC “Orenburgneft” production fields constructing and assembling. 2010 TNK-BP, JSC “Orenburgneft”, Orenburg region, Buzuluk Turn-key 10 associated gas volume automated measuring systems construction, nominal diameter 50–250 mm.
10 Construction of block-modular gas refueling unit for liquid hydrocarbon truck tanker loading. 2009 LLC “AZSTRASTSTROY”, Samara Block-modular gas refueling unit with capacity of 60 cubic meters per hour design and construction (2 terminal bays).
11 Associated gas volume automated measuring systems at OJSC “Samaraneftegas” production fields constructing and assembling. 2009 JSC “Samaraneftegas”, Samara Turn-key 4 associated gas volume automated measuring systems construction, nominal diameter 50–150 mm.
12 Inner gas-supply and radiant heating automated system of CJSC “ZHBI-8 plant” facilities. 2009 CJSC “ZHBI-8 plant”, Samara region, Bezenchuck Construction and assembly operations, start-up operations of 3 production buildings with total area of 18 000 square meters.

In 2011 the total scope of Construction and Assembly Operations was 192 million rubles.

Process Control System

№  Subject Accomplish- ment year Customer, facility location Summary
1 Process control system integration in “Overflow fuel gas recovery system installation on heat electric generation plant of JSC ”Kuibyshev Refinery“ 2011 JSC ”Kuibyshev Refinery“, Samara Process control system start-up operations of 4 boiler units with capacity of 60 megawatt each. 3 types of fuel. 3000 signals.
2 Boiler house process control system project development and integration. 2011 LLC ”Inzhelectrocomplect Plus“, Moscow Boiler house full automation, 4 boiler units with capacity of 5 megawatt each.
3 Flow meter calibration unit process control system project development and integration. 2011 LLC ”Gazprom Dobycha Orenburg“, Orenburg ”Porto-Test“ well-production rate measurement mobile unit automatic control.
4 ”Kochevnenskoye facility“ process control system project development and integration. 2010 Oil producing company CJSC"SANEKO”, Samara Oil treatment unit with capacity 1200 tons per 24 hours full automation.
5 Turbocompressor “Viola” process control system project development. 2009 LLC “Tolyatti caoutchouc”, Samara region, Tolyatti Turbo compressors automatiс control. 1200 signals.
6 Project development of “Farafontyevskaya station liquid hydrocarbon export terminal” 2009 CJSC “Severorgsintez”, Novy Urengoy Offloading process automatic control. 900 signals.
7 Air-control unit for broad fraction of light hydrocarbons refinery Process control system development and integration. 2009 CJSC “Neftechimia”, Samara region, Novokuybyshevsk Broad fraction of light hydrocarbons refinery unit automatiс control. 1600 signals.

In 2011 the total scope of Process Control System was 11 million rubles.

Maintenance Service

№  Subject Accomplish- ment year Customer, facility location Summary
1 Oil custody transfer metering stations maintenance service. 2009-
2011
JSC “Samaraneftegas”, Samara 23 Oil custody transfer metering stations maintenance and calibration.
2 Associated gas volume automated measuring systems maintenance. 2009-
2011
JSC “Samaraneftegas”, Samara 168 Associated gas volume automated measuring systems maintenance and calibration.
3 Crude oil custody transfer metering system maintenance at “Prosvet” central processing facility. 2009-
2011
CJSC “Samara-Nafta”, Samara Crude oil custody transfer metering system maintenance and calibration.
4 Crude oil custody transfer metering system maintenance at “Prosvet” central processing facility. 2009-
2011
CJSC “Samara-Nafta”, Samara Crude oil custody transfer metering system maintenance and calibration.
5 Measurement instrumentation at CJSC “SANEKO” facilities maintenance. 2009-
2011
Oil producing company CJSC “SANEKO”, Samara 1600 process control instruments maintenance.

In 2011 the total scope of Maintenance Service was 11 million rubles.